- Use the right clamp for the load: a rail clamp for rails, a concrete pipe clamp for concrete pipes. Do not improvise.
- Check the size range: the load must be within the clamp's opening and weight range.
- Place scissor clamps at the balance point of the load, so it hangs level.
- Make sure the jaws are fully engaged before the load leaves the ground, and lift a short way first to check.
- Keep the load steady; tag lines help control long pipes and rails.
- Lower onto supports so the clamp can be released without trapping hands.